WMG HQ -Ford Factory Building
-
Project Type: Office | Restoration | Adaptive Reuse
Location: Arts District, Los Angeles
Size: 245,000 sf
-
Architect: Rockefeller Partners
Client: Warner Music Group
Interior Designer: Rockwell Group
General Contractor: Howard Building Corporation
Landscape Architect: Border LA
Mechanical: AMA Group
Structural Engineer: Nabih Youseff and Associates
-
AIA|CA Design Awards - Merit Award
AIA|SBLB Design Awards - Citation Award
USGBC Sustainable Innovation Award
Rethinking the Future Awards - Second Award
Global Architecture & Design Awards - First Awardcription
Our story of this project spans the course of nearly a decade. It began with a derelict historic auto factory and the fight to keep its bones from the wrecking ball and ended with the celebration of a building’s new life as a uniquely creative office space to work and thrive.
Located in the Arts District neighborhood of downtown Los Angeles, the Ford Motor Company Factory building was initially built as a five-story office tower and Model T showroom (1913) and a two-story, nearly 300 ft long factory Assembly Building (1923). It was designed by John Parkinson, one of LA’s most prolific architects responsible for designing the Los Angeles Memorial Coliseum and iconic Los Angeles City Hall, and George Bergstrom, who later designed the Pentagon. In the 1980s, a simple two-story masonry structure was added at the very end of the Assembly Building to infill the site. The building later hosted several other tenants and, over time, fell into disrepair and neglect.
In 2014 our first objective was to preserve the historic architectural fabric and restore the building to a usable state. It included modernizing the building with critical infrastructure updates and making it as energy efficient as possible. Additionally, we created an outdoor linear park and a natural green roofscape. Restoring the building rather than demolishing it resulted in enormous (embodied) energy savings while preserving a Los Angeles architectural icon.
Improvements to the base building core and shell resulted in LEED Gold certification through the USGBC.
The project team’s second objective brought this building back to life as creative office space for Warner Music Group as their new headquarters. The historic building and its original (newly restored) daylighting strategies were exploited to help create an open, bright, and spacious work environment. Likewise, the design team strategically cut floor openings at two locations of the Tower. One, to create a Center Stage for WMG music performances and corporate gatherings. The other, beneath the historic saw-toothed skylight and its natural daylight to connect the two floors with a Bleacher Stair for communal gathering and collaboration.
Today, the building is a thriving work environment housing all 7 of WMG’s record and publishing groups under one roof. The restoration and design process were an epic endeavor and collaboration to get to where we are today. The results are a beautiful co-joining of both historic and modern.